planning blog

Props: Since as a group we decided to work on an apple

commercial, our main prop will be apple products. Other

props we will include will be bags and school supplies.

Costumes: In our commercial we will have 2 different

costumes for each actor. The first costume will be a casual

outfit, something that people would wear to school. The

second costume will consist of athletic clothing. Something

along the lines of a tank top or a cotton t-shirt and athletic

shorts or athletic tights.

Schedule: 11/22/21, our group researched and planned the

apple commercial

11/24/21, our group will create the storyboard for the

commercial

11/28/21, our group will film and record necessary shots

11/30/21, our group will edit and add final touches to the commercial 


Location List: Our first few shots will be in the classroom or senior patio. Here we will record our actor messing around in the class before dashing off as the belle rings for schools end This will get us to be able to show off the airpods and MacBook as necessary items for class. Our next and last location will be outside on the track. At this location we will film our actor(s) finishing up a run with their airpods in and checking out their watch. Also bumping into some friends on their phone. This will help us show that apple products can also apple products can also be used by an athlete. Backup Plan: If the weather is not as expected, then, our track location will be changed to the large stairs of building 5. There we will still be doing exercises however it will more than likely be running/jumping up the stairs. If a member is absent on the day of filming one person in the group will film







Comments

Popular posts from this blog

Comparing Le Jetee, the short, and 12 Monkeys, the full-length movie

Editing for Short Film Begins

Production For My Short Film Continues